Vault Index

Project Timeline

Projects are listed as a timeline-style archive even where dates are still sparse. Each entry pulls its blurb and body from the vault note itself.

2004

Loss Sensitive Invoicing Modernization

Coming soon.

Zurich North America

Open page →

Date in vault not finalized

Warehouse Inventory Analysis

Coming soon.

Freelancing • Tykables Data Analytics Department

Open page →

Date in vault not finalized

Virtual Machine Configuration Management Optimization

Coming soon.

Open page →

Date in vault not finalized

Vendor Invoice Processing (One CIS)

Coming soon.

Zurich North America • Zurich Risk Engineering

Open page →

Date in vault not finalized

USBN Lapoon

Night-shift quality control work at Norfolk Naval Shipyard on USS Lapon (SSN-661), a Sturgeon-class nuclear attack submarine, supporting overhaul-era inspection of cabling and electronic workmanship critical to sonar...

US Navy • Norfolk Naval Shipyard • Quality Control

Open page →

Date in vault not finalized

Time and Expense Baselining

Coming soon.

Zurich North America • Zurich Risk Engineering

Open page →

Date in vault not finalized

Third-Party Transactions (JOL)

Coming soon.

Zurich North America • Zurich Risk Engineering

Open page →

Date in vault not finalized

TestFlight

Coming soon.

Open page →

Date in vault not finalized

Survey Gizmo Ingestion

Coming soon.

Zurich North America • Zurich Risk Engineering

Open page →

Date in vault not finalized

Student Loan Consolidation Undewriting Workbench

Coming soon.

RDA • Sallie Mae Underwriting

Open page →

Date in vault not finalized

State Entitlement Calculator

Coming soon.

Ellsworth Associates (EA) • US Department of Health and Human Services

Open page →

Date in vault not finalized

Scrape Inventory From Competitors Web Sites

In a freelance project, I worked on analyzing several competitors’ Shopify storefronts by observing data exposed through the sales site, including hidden quantityrelated attributes. From this, we were able to infer...

Freelancing • Tykables Data Analytics Department

Open page →

Date in vault not finalized

Safety Culture Survey

Coming soon.

Zurich North America • Tykables Data Analytics Department

Open page →

Date in vault not finalized

Safety Calendar Automation

Coming soon.

Zurich North America • Zurich Risk Engineering

Open page →

Date in vault not finalized

RULE Notifications

Coming soon.

Zurich North America • Zurich Risk Engineering

Open page →

Date in vault not finalized

Risk Grading Benchmarks

Coming soon.

Zurich North America • Zurich Risk Engineering

Open page →

Date in vault not finalized

Risk Engineering Data Mart

Coming soon.

Zurich North America • Zurich Risk Engineering

Open page →

Date in vault not finalized

Reinsurance Cessions Calculator

Coming soon.

Zurich North America • Zurich Reinsurance

Open page →

Date in vault not finalized

REFINE

Coming soon.

The REFINE Group (TRG) • TRG Product Development

Open page →

Date in vault not finalized

Refactor Embedded Access Control Database

Refactored a denormalized embedded access control data model into a more space-efficient normalized structure so larger customer installations could fit on existing hardware.

Litton Poly-Scientific (LPS) • LPS Access Control Systems

Open page →

Date in vault not finalized

RED (Static)

Coming soon.

Zurich North America

Open page →

Date in vault not finalized

RECAT

Coming soon.

Zurich North America

Open page →

Date in vault not finalized

Quality Review Automation and Workflow

Coming soon.

Zurich North America

Open page →

Date in vault not finalized

POEMS

Coming soon.

US Department of Commerce (US DoC)

Open page →

Date in vault not finalized

Optimize Bulk Door Access Control Lists

Used the platform's new broadcast capability to cut mass door-access updates from hours to minutes for a customer facing a time-sensitive layoff event.

Litton Poly-Scientific (LPS) • LPS Access Control Systems

Open page →

Date in vault not finalized

My Zurich Preview

Coming soon.

Zurich North America

Open page →

Date in vault not finalized

Migrate REW to GREW

Coming soon.

Zurich North America

Open page →

Date in vault not finalized

Leavers Report

Built a manager-facing exception-reporting process that surfaced work stranded by departing employees without forcing users to monitor another report every day.

Zurich North America • Zurich Risk Engineering

Open page →

Date in vault not finalized

Introduction to Robotics

Coming soon.

Open page →

Date in vault not finalized

Introduction to Programmable Logic Controllers

Coming soon.

Open page →

Date in vault not finalized

Identify Minority Responses to University Mass Mailing

Coming soon.

Virginia Tech (VT)

Open page →

Date in vault not finalized

iAuditor Ingestion

Coming soon.

Zurich North America

Open page →

Date in vault not finalized

External Service Request Router

Coming soon.

Zurich North America

Open page →

Date in vault not finalized

Excel Extractor

Adapted the bulk Excel reporting architecture into an account-level extraction tool that let users compare complex customer histories across more than 20 entities in a single workbook.

Zurich North America • Zurich Risk Engineering

Open page →

Date in vault not finalized

Electronics Layoff

Coming soon.

Open page →

Date in vault not finalized

Electronics (Freshman and Sophomore Years)

Coming soon.

Open page →

Date in vault not finalized

Earning Model Report

Coming soon.

Zurich North America

Open page →

Date in vault not finalized

Convention Center Anonymous People Tracker

Coming soon.

Freelancing

Open page →

Date in vault not finalized

Cognu

Coming soon.

Freelancing

Open page →

Date in vault not finalized

Capacity and Utilization Report

Coming soon.

Zurich North America • Zurich Risk Engineering

Open page →

Date in vault not finalized

Business Partner Feedback Invites

Designed a feedback-invite selection process that reused existing notification infrastructure while balancing survey coverage against email fatigue for business partners.

Zurich North America • Zurich Risk Engineering

Open page →

Date in vault not finalized

Business Objects Modernization

Represented Risk Engineering on a large steering committee guiding a Business Objects modernization effort required to move the organization off an aging, soon-to-be-unsupported platform.

Zurich North America • Zurich Risk Engineering

Open page →

Date in vault not finalized

Bulk Excel Workbook Creation

Built a batch reporting factory that generated filtered Excel workbooks for 50 management teams by combining a reusable SQL reporting API with template-driven workbook automation.

Zurich North America • Zurich Risk Engineering

Open page →

Date in vault not finalized

Automate Book of Business Report Generation

Coming soon.

Zurich North America • Zurich Risk Engineering

Open page →

Date in vault not finalized

Alias Management and Mapping

Coming soon.

Zurich North America • Zurich Risk Engineering

Open page →

Date in vault not finalized

Add Broadcast Capability to Access Control System

Added broadcast messaging to a legacy two-wire access control network by replacing redundant door-to-door traffic with a lighter communication pattern that unlocked future feature delivery.

Litton Poly-Scientific (LPS) • LPS Access Control Systems

Open page →

Date in vault not finalized

Add Anti-Passback Capability to Access Control System

Designed and delivered an anti-passback capability for a legacy embedded access control system by modeling secure spaces as a lightweight graph and building on newly added broadcast messaging.

Litton Poly-Scientific (LPS) • LPS Access Control Systems

Open page →